You don't have javascript enabled. Good luck with that.
Pencarian
 Pengerjaan 20 Sumur Resapan di Pulau Pari Mencapai 50 Persen

Thousand Islands SDA Builds 20 Infiltration Wells in Pari Island

This year, Thousand Islands Water Resources (SDA) Sub-agency targeted to build 20 infiltration wells at RW 04, Pari Island Urban Village, South Thousand Islands.

Infiltration wells are great to prevent inundation either because of rain and tidal flooding

Until this day, Thousand Islands SDA Sub-agency Head, Abdul Rouf mentioned, his side has realized 50 percent of total 20 infiltration wells.

"As many as 10 infiltration wells have been completed. Now, we need to build the remaining retaining walls in 10 other locations at RT 02," he explained, Tuesday (10/6).

Three Infiltration Wells Made on Untung Jawa Island

According to him, infiltration wells were made with size 2 x 2 meters with depth of 1.5 meters. Each infiltration well was connected to one another using paralon pipe to make it effective in absorption.

"Infiltration wells are great to prevent inundation either because of rain and tidal flooding," he said.

His side deployed 11 PJLP personnel of Thousand Islands SDA Sub-agency to build infiltration wells.

"Overall, we target it to finish the construction in this December," he asserted.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye869 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye424 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye371 personDessy Suciati
  4. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye358 personAldi Geri Lumban Tobing
  5. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye358 personDessy Suciati
close